Whole-home renovation cost in Miami (2026)
A whole-home renovation in Miami-Dade or Broward can mean refreshing several rooms, or taking a house down to the structure and building the interiors back. This guide is market context for 2026, not a Kirpich bid. The per-square-foot ranges below come from a published 2026 Miami-area contractor cost guide. For a written scope, call (305) 707-7353 or Get a Free Estimate.
Kirpich, LLC is a Certified General Contractor. We confirm what the project needs and coordinate permits. Kirpich has 15+ years in South Florida remodeling and is rated 5.0 on Google. Workmanship is covered by our 1-year workmanship warranty.
Mid-range and gut-renovation ranges (2026 market context)
A published 2026 Miami-area contractor cost guide commonly describes a mid-range whole-home renovation around $100–$150 per square foot, and a gut renovation around $150–$250 per square foot. "Mid-range" usually means updating kitchens, bathrooms, flooring, paint and fixtures while keeping much of the existing layout and structure. A gut renovation typically means removing interior finishes back to the structure, relocating some walls or rooms, and replacing mechanical, electrical and plumbing systems as the design requires.
These bands are averages for planning, not a ceiling or a floor. A smaller house can cost more per square foot than a larger one because kitchens, bathrooms and impact-related openings do not shrink as fast as floor area. Coastal construction, older plumbing, a flood-zone review, or a historic or village design review will push a job up. A cosmetic refresh that leaves the kitchen and baths in place will sit lower. To see how loans fit a budget, read how pre-qualifying for renovation financing works.
What usually drives a whole-home number
Kitchens and bathrooms carry a large share of the budget. Flooring, interior paint, lighting and trim fill in the living areas. Moving walls, especially load-bearing ones, adds engineering and structure. South Florida houses often need slab or plumbing surprises once floors come up. If the property is in a FEMA special flood hazard area, a large improvement can trigger the 50% substantial-improvement rule, which can change the scope of the whole building. FEMA explains the rule here: Substantial Improvement / Substantial Damage. Florida law (Section 163.31795, Florida Statutes) bars local governments in the flood insurance program from enforcing a cumulative look-back period. This is general information, not legal advice; confirm with your building department and association.
For a closer look at kitchen and bath planning, see kitchen remodeling, bathroom remodeling and what affects remodeling cost in South Florida. For bathroom ranges by scope, see bathroom remodel cost in Miami.
Permits, associations and house-bill exemptions
We confirm what the project needs and coordinate permits. A whole-home job almost always needs a building permit, and often several related trades. In a condominium, unit work also needs board approval; Kirpich prepares the condo board paperwork. House Bill 803, as discussed on our permits guide, does not apply to condominium units. Owners of single-family homes should still confirm with the local building department which exemptions, if any, apply to their scope. This is general information, not legal advice.
The way to compare whole-home projects is a written scope, not a handshake estimate. See also the contracts and change-orders guide.
Contract paperwork on a whole-home job
A whole-home contract on a house usually carries the notices Florida law requires.
- Section 713.015, Florida Statutes, requires a construction-lien notice, signed and dated by the owner, in direct contracts over $2,500 for one- to four-family dwellings.
- Section 489.1425 requires a written Recovery Fund statement in residential contracts unless labor and materials are $2,500 or less.
- Under Section 489.126, a contractor who takes more than 10% of the contract price as an initial payment must apply for permits within 30 days and start work within 90 days after the permits are issued, unless there is just cause or the owner agreed in writing to longer periods.
- Before work starts, the owner records a notice of commencement under Section 713.13.
Florida's $7,500 permit exemption rarely matters here: a project can't be split to stay under the limit, and electrical, plumbing, structural and mechanical work are excluded. More detail is in the contracts and change-orders guide. This is general information, not legal advice.
How a whole-home job is usually sequenced
Planning comes first: what stays, what moves, and what the structure and mechanical systems can support. Demolition and any structural openings follow permits. Rough mechanical, electrical and plumbing are installed and inspected before insulation and drywall. Finishes, kitchens, baths, flooring and paint come last. If you will live in the house during the work, see preparing to live through a remodel.
If the goal is to prepare a house for sale rather than to live in the finished space, start with renovating to sell in Miami. If storm or water damage is the reason for a full interior rebuild, see storm, water and fire damage rebuilds.
Work is available across Miami-Dade and Broward, including Coral Gables, Pinecrest, South Miami, Miami Shores, Weston, Fort Lauderdale and other cities we serve.
Room-by-room budget drivers
Kitchens and bathrooms usually take the largest share of a whole-home budget because they combine cabinets or vanities, counters, plumbing, electrical and wet-area finishes. Flooring and paint cover more square footage but are often a smaller share per room. Mechanical, electrical and plumbing work — a panel upgrade, relocated plumbing, or new supply lines once floors are up — can move the number as much as a finish upgrade. Structural openings, described in the load-bearing wall guide, add engineering and a different permit path. These are the places to look when two written scopes differ.
How to compare whole-home bids
Compare written scopes, not a single number. Check whether allowances are used and how they are reconciled, what is excluded, how permits are coordinated, and whether a contingency is listed as a homeowner planning concept for hidden work. Ask whether demolition, flooring, paint, light fixtures and appliance connections are in or out. For flooring as a line item, see the flooring installation cost guide.
Condo units and single-family houses
A whole-unit renovation in a condominium still needs board approval; Kirpich prepares the condo board paperwork. House Bill 803 does not apply to condominium units. A single-family house may have a different permit path, a flood-zone review, or more room to change the layout. In both cases we confirm what the project needs and coordinate permits. This is general information, not legal advice; confirm with your building department and association.
Related pages
Home renovation · What affects remodeling cost · Contracts and change orders · Renovating to sell · Permits guide · Load-bearing wall removal
Frequently asked questions
How much does a whole-home renovation cost in Miami in 2026?
A published 2026 Miami-area contractor cost guide commonly describes a mid-range whole-home renovation around $100–$150 per square foot, and a gut renovation around $150–$250 per square foot. Your project may land outside those bands depending on kitchens and baths, structure, flood-zone review and finish level. These are market ranges, not a Kirpich quote; compare written scopes.
Does House Bill 803 apply to a condominium unit?
No. House Bill 803, as discussed on our permits guide, does not apply to condominium units. Unit owners should still plan on association approval and, where required, a permit. This is general information, not legal advice; confirm with your building department and association.
What is the FEMA 50% rule for a large remodel?
In a FEMA special flood hazard area, if the cost of improvements or repairs reaches 50% of the building's market value, the building generally has to be brought up to current floodplain standards. That can change the scope and cost of a remodel or a storm-damage rebuild. FEMA explains the rule in its glossary entry for substantial improvement. Florida law now bars local governments in the flood insurance program from enforcing a cumulative look-back period, so ask the floodplain administrator how your project will be counted. This is general information, not legal advice; confirm with your building department and association.
Does a whole-home renovation always need a permit?
A whole-home job almost always needs a building permit, and often several related trades. We confirm what the project needs and coordinate permits. This is general information, not legal advice; confirm with your building department and association.