How much does a bathroom remodel cost in Miami? Published 2026 Miami-area contractor cost guides put a cosmetic refresh at roughly $15,000 to $22,000, a full remodel that keeps the layout at roughly $22,000 to $48,000, and a remodel that moves the shower, toilet or drains at roughly $35,000 to $55,000. Condo bathrooms usually cost more because of building rules. These are market ranges, not a Kirpich quote; compare written scopes.
The biggest swing is whether plumbing moves, not the tile you pick.
Kirpich, LLC is a Certified General Contractor in Miami-Dade and Broward. We confirm what the project needs and coordinate permits. Kirpich has 15+ years in South Florida remodeling, is rated 5.0 on Google, and covers workmanship with a 1-year workmanship warranty.
Typical cost by scope
Most bathroom estimates fall into one of four scopes. The row your project lands in matters more than the size of the room.
| Scope | What is usually included | Market range (2026) | What pushes it higher |
|---|---|---|---|
| Cosmetic refresh | New vanity, fixtures, lighting and paint, sometimes new floor tile, with the shower and drains left where they are | About $15,000 to $22,000 | Replacing tile around the tub or shower; repairs found behind old tile |
| Full remodel, same layout | Wet areas taken down to the studs: new shower or tub, waterproofing, tile, vanity, toilet, lighting and ventilation, with fixtures in their current locations | About $22,000 to $48,000 | Larger showers, frameless glass, large-format or patterned tile, condo building requirements |
| Layout change | Moving the shower, toilet or drains, including a tub-to-shower conversion with a new drain location | About $35,000 to $55,000 | Slab work, longer plumbing runs, engineering or association review |
| Primary-suite luxury | Custom layouts, premium stone and glass, specialty fixtures | Priced after design | Scope and selections set the number |
Ranges from published 2026 Miami-area contractor cost guides. These are market ranges, not a Kirpich quote; compare written scopes.
Condo bathrooms vs house bathrooms
Why the same room costs more in a tower
A condo bathroom has the same tile and fixtures as a house bathroom, plus the building. Before work starts, most associations ask for a written scope, drawings when plumbing changes, contractor documents and sometimes a deposit. During the job, crews work in set hours, materials move through a reserved service elevator, and the drains connect to stacks shared with other units. Moving a drain can mean coring the slab, which is your neighbor's ceiling, so many boards want an engineer to review it. Florida law says a unit owner shall not do anything that would adversely affect the safety or soundness of the common elements (Section 718.113(3), Florida Statutes), which is why boards look closely at slab and plumbing work.
Condo range
For a condo bathroom kept in place, one published 2026 Miami-area contractor cost guide shows roughly $25,000 to $42,000 with standard finishes and $47,000 to $77,000 with high-end finishes. These are market ranges, not a Kirpich quote; compare written scopes.
Kirpich prepares the condo board paperwork your building asks for. See condo board approvals and timeline and condo renovation cost.

What moves the number
- Moving a drain. Relocating the shower, toilet or vanity adds plumbing, slab work and, in a condo, board review.
- What is behind the tile. Old water damage, rotted framing or failing pipes often show up only after demolition.
- Waterproofing scope. A larger shower or a curbless floor needs more membrane, more detailing and a test before tile.
- Shower size and glass. Larger showers and frameless glass cost more than a standard tub and curtain.
- Tile format and pattern. Large-format slabs, herringbone and mosaics take more labor to set than a simple grid. See tile and flooring costs.
- Ventilation and electrical. A new exhaust fan, lighting or outlets add electrical work.
- Contingency. A published 2026 Miami-area contractor cost guide commonly suggests a 10% to 20% contingency, toward the high end in older homes.
Permits for a bathroom remodel in Miami-Dade and Broward
Most bathroom remodels need a permit. Florida's $7,500 permit exemption (Section 553.79(1)(g), Florida Statutes) covers owners of single-family dwellings for work valued under $7,500, but it doesn't cover any electrical, plumbing, structural, mechanical or gas work, it doesn't apply in a flood hazard area, and a project can't be split to stay under the limit. Miami-Dade County states that units in multi-family buildings do not qualify.
In unincorporated Miami-Dade, the County's Permit Exemptions guide says replacing a vanity in the same configuration isn't regulated by the building code, and repairing or replacing faucets, toilets and sink fixtures is exempt when a licensed plumbing contractor does it. Any associated plumbing, ventilation or electrical work that is relocated, reconfigured or altered needs a building permit. Cities issue their own permits.
We confirm what the project needs and coordinate permits. For the bigger picture, see renovation permits in Miami-Dade and Broward. This is general information, not legal advice; confirm with your building department and association.
How long a bathroom remodel takes
Published 2026 Miami-area contractor guides put a full bathroom remodel at about 3 to 8 weeks of work, often a week or two longer in a condo. That is construction time. Design, selections and permit review come first.
In a condo, association reviews commonly take about 30 to 60 days, and some buildings turn a simple, complete package around in 1 to 4 weeks. Miami-Dade County says an initial permit plan review can take 24 hours to 10 business days, and each correction cycle adds review time; cities set their own times. See the condo renovation timeline.
Tub-to-shower and walk-in showers
A tub-to-shower conversion changes the waterproofing, the drain and usually the glass. If the new shower drain stays where the tub drain was, the job is closer to a same-layout remodel; if the drain moves, it falls in the layout-change row above.
A walk-in shower with a low curb is a different detail from a fully curbless floor, which needs room for the drain and waterproofing below the finished floor. In many existing South Florida slabs, a low curb is the more common result. See planning a bathroom remodel for the decisions to lock before tile is ordered.

How to compare bathroom estimates
Put bids side by side on the same written scope. A useful bathroom estimate lists:
- Demolition and disposal
- The waterproofing method and the test before tile
- Plumbing and electrical work, including anything that moves
- Tile, glass, vanity and fixtures, with allowances listed separately from labor
- Permit coordination and, in a condo, the association package
- Exclusions
- How concealed damage will be priced and approved
- The payment schedule
See what a renovation contract should include. If you plan to borrow, read about financing a bathroom remodel before you sign.
For the service itself, see bathroom remodeling, or our local pages on bathroom remodeling in Pembroke Pines and bathroom remodeling in Miramar.
Bathroom remodel cost FAQ
How much does a small bathroom remodel cost in Miami?
Published 2026 Miami-area contractor cost guides put a cosmetic refresh at roughly $15,000 to $22,000 and a full remodel that keeps the layout at roughly $22,000 to $48,000. Size matters less than whether plumbing moves and how much tile and glass the room needs. These are market ranges, not a Kirpich quote; compare written scopes.
Why does a condo bathroom cost more?
The building adds work: board approval, insurance certificates, set work hours, elevator bookings, protection of common areas and shared plumbing stacks. Moving a drain can mean coring the slab and an engineer's review. For a condo bathroom kept in place, one published 2026 Miami-area contractor cost guide shows roughly $25,000 to $42,000 with standard finishes and $47,000 to $77,000 with high-end finishes. These are market ranges, not a Kirpich quote; compare written scopes.
Do I need a permit to remodel a bathroom in Miami-Dade?
Usually. Florida's $7,500 permit exemption doesn't cover electrical, plumbing, structural, mechanical or gas work, and Miami-Dade County states that units in multi-family buildings do not qualify. In unincorporated Miami-Dade, replacing faucets, toilets and sink fixtures is exempt when a licensed plumbing contractor does it, but relocated or altered plumbing, ventilation and electrical work needs a building permit. We confirm what the project needs and coordinate permits. This is general information, not legal advice; confirm with your building department and association.
How long does a bathroom remodel take?
Published 2026 Miami-area contractor guides put a full bathroom remodel at about 3 to 8 weeks of work, often a week or two longer in a condo. Design, association review and permit review come before that.
How much contingency should I plan for?
A published 2026 Miami-area contractor cost guide commonly suggests a 10% to 20% contingency, toward the high end in older homes. Ask how concealed damage will be priced and approved before work starts.
Free written estimate: (305) 707-7353. 15+ years · 5.0 on Google · 1-year workmanship warranty.