Guide
How Condo Renovations Work in Miami-Dade and Broward: Approvals, Permits and Building Rules
Renovating a condo is different from renovating a house. Your unit sits inside a building with its own rules, a board or management office that has to sign off, shared elevators and hallways, and neighbors on every side. Whether you own in Aventura, Bal Harbour, Miami Beach or Fort Lauderdale, a little planning before demolition day saves weeks of waiting later. Here's how the process usually works, and what you can do to keep it moving.

Start with your building's renovation rules
Every association writes its own rules, so the first step is to ask management for the building's renovation or alteration packet. Read it before you pick finishes. Common items to look for:
- Which work needs board approval (often anything beyond paint and minor repairs)
- Work hours and days when noisy work is allowed
- Elevator reservations and protection for hallways and elevators
- Where debris goes and how materials come in
- Flooring rules, such as whether an underlayment is required under hard floors
- Deposits, fees or a review period before approval
Requirements vary from building to building, so don't assume what applied in your last condo applies here.
Put together the approval package
Many buildings ask for a written scope of work, drawings or plans, the contractor's license and insurance certificates, and a signed renovation agreement. A clear package gets reviewed faster. A vague one comes back with questions.
Tips that help:
- Describe the work room by room, in plain language.
- Say what's being moved and what stays: plumbing fixtures, walls, electrical.
- Include product information when the building asks for it (flooring, for example).
- Keep copies of everything you submit and note the date.
At Kirpich, LLC we put together the package your building asks for, answer management's questions and track approval status for you.
Find out which permits your project needs
Board approval and a building permit are two separate things. Many renovations, including most work that touches plumbing, electrical, structure, windows and doors, or room layout, need a permit from the city or county where the building is located. Cosmetic work often doesn't, but the line depends on the scope and the jurisdiction, so confirm before work starts.
A permitted project gets inspected and closed out properly. That matters later, when you sell, refinance or insure your unit. Your contractor should tell you which permits apply, prepare and submit the applications and drawings, respond to plan-review comments and schedule inspections.
Plan the schedule around the building
In a condo, the calendar isn't only yours. Approval review, permit review, elevator bookings and allowed work hours all shape the timeline. A few habits keep things on track:
- Order long-lead items (cabinets, stone, special tile) early, after the scope is final.
- Book the elevator for big deliveries and debris removal.
- Let your neighbors know when the noisiest days are coming.
- Keep a copy of the approval and the permit at the unit.
Protect common areas and keep neighbors on your side
Good condo work is invisible outside your door. That means protecting hallway floors and elevator walls, keeping dust contained, cleaning up daily and respecting quiet hours. Buildings remember contractors who leave a mess, and so do neighbors.
Choosing what to renovate
Most condo owners focus on the rooms that matter most day to day: kitchens and bathrooms, flooring, interior painting and custom closets. Some renovate one room at a time, and others do the whole unit at once so the building only goes through one approval and one disruption. Both can work. It depends on your budget, your schedule and whether you'll live there during the work.
Questions to ask before you hire a contractor
- Have you renovated condos in buildings like mine, and do you know how board approval packages work?
- Who prepares the approval package and the permit applications?
- How will you protect hallways and elevators and handle debris?
- How will you keep me updated on approval and permit status?
Clear answers to these questions tell you a lot about how the project will go.

Ready to plan your condo renovation?
Kirpich, LLC renovates condos across Miami-Dade and Broward, with 15+ years of experience. We handle the board approval package and the permits as part of your project, so you can focus on design choices instead of forms and follow-up calls.
Call (305) 707-7353 or visit kirpichllc.com for a free estimate. Hours: Mon–Fri 9am–6pm, Sat–Sun 10am–4pm.
Ready to start your project?
Tell us about your project and get a clear written scope and estimate.