Guide
Do you need a permit for a kitchen remodel in Miami-Dade?
Short answer: if the work goes beyond cosmetic updates — moving plumbing, adding circuits, changing walls, or replacing ventilation — plan on a permit. Here’s how to figure out where and how.
1. Find out who your building department is
Miami-Dade has many cities with their own building departments. If your home is in unincorporated Miami-Dade (for example much of Kendall), permits come from the Miami-Dade County Building department. If you’re inside a city like Coral Gables, Pinecrest or South Miami, that city issues the permit.
2. Know what usually triggers a permit
- Electrical work: new circuits, moved outlets, new lighting runs
- Plumbing: moving the sink, adding a pot filler, new gas lines
- Walls: removing or adding walls, especially load-bearing ones
- Mechanical: range hoods vented outside, HVAC changes
Painting, cabinet refacing and like-for-like countertop swaps often don’t need one, but rules vary — ask your building department before you start. Pinecrest, for example, takes separate electrical, plumbing and mechanical applications alongside the building permit (Permits FAQ).
3. Condos and HOAs come first
In condos, the association usually has to approve the work and see a scope, plans and contractor documents before work starts. See our permits & condo approvals page.
4. Notice of Commencement
For larger improvements Florida law requires a recorded Notice of Commencement before the first inspection — see Florida Statutes §713.13 for the rules.
5. Inspections and close-out
Expect rough inspections before walls are closed and final inspections at the end. Keep the permit card on site and don’t cover work before it passes.
Get a free estimate · More guides
Related service: kitchen remodeling in Miami-Dade and Broward.
Ready to start your project?
Tell us about your project and get a clear written scope and estimate.